Licensed, bonded & insured · ROC 000000 (sample)

Every job,
in depth.
Same-day service
(480) 555-0164What each service involves and what to have ready. Not sure which one you need? Flip through the panel below, or call and describe what’s happening.

Panel upgrades
More room,
safer breakers.
A full panel, a buzzing one, or a brand the insurers have stopped liking: we fit a new 200-amp panel with room to grow, label every circuit, and have it inspected. Most are done in a day, with the power off for only part of it.
- New 200-amp panels
- Sub-panels for garages and additions
- Whole-home surge protection
- Every circuit labelled

EV chargers
Charge at home,
overnight.
A Level 2 charger on its own circuit, mounted where the car actually parks, with the load calculation done first so you know the panel can take it. We fit the charger you choose, and tell you what to look for if you haven’t chosen yet.
- Level 2 chargers on their own circuit
- Load calculations before anything else
- Mounted where you park
- Permit and inspection included

Lighting
Rooms that look the
way you meant.
Recessed cans laid out so the room is lit and not just the floor, pendants hung level over the island, under-cabinet strips that don’t show, and landscape lights that make the house look like it’s doing it on purpose. Dimmers that don’t flicker.
- Recessed cans and pendants
- Under-cabinet and cove lighting
- Dimmers that don’t flicker
- Outdoor and landscape lighting

Repairs and wiring
Dead outlets and
tripping breakers, found.
We find the cause, not just the symptom, and write down what we found before we fix it. Outlets, switches and GFCI protection, aluminium and cloth-wire fixes, and ceiling fans hung on a box that was made for them.
- Troubleshooting with a written finding
- Outlets, switches and GFCI
- Aluminium and cloth-wire fixes
- Ceiling fans on fan-rated boxes

Generators
When the grid goes,
you don’t.
A standby generator that starts itself, or a portable-ready inlet with a transfer switch, sized to what you actually need to keep running: the fridge, the lights, the AC in July. Serviced once a year so it starts when it matters.
- Standby generators and transfer switches
- Portable-ready inlets
- Sized to what you need to keep running
- Yearly test and service
Do you do my kind of job?
Flip a breaker,
see what it takes.
Eight jobs we do every week. Pick one for what’s involved, how long it takes, whether it needs a permit and what to have ready when we call.
Northvane Electric · 200A main
01
Panel upgrade
Your panel is the heart of the house. If it’s full, buzzing, a brand known to fail, or you’re adding a charger or an addition, it’s time. We fit a new 200-amp panel, label every circuit and have it inspected.
- Takes
- One day
- Permit
- Yes, we pull it
- Have ready
- A photo of the panel with the door open
- Your utility account number
- A clear path to the panel
02
EV charger
A Level 2 charger on its own circuit, mounted where your car actually parks. We check that your panel has the room first, and say so if it doesn’t.
- Takes
- Half a day
- Permit
- Yes, we pull it
- Have ready
- Your car’s make and model
- A photo of where you park
- A photo of your panel
03
Rewire
Older homes with cloth wiring, aluminium branch circuits or too few circuits get new copper, new boxes and new breakers, room by room or the whole house.
- Takes
- 3 to 10 days
- Permit
- Yes, we pull it
- Have ready
- The age of the home
- Which rooms worry you
- Any letter from your insurer
04
Lighting
Recessed cans, pendants, under-cabinet strips and landscape lights, on dimmers that don’t flicker. We help you lay it out before we cut a single hole.
- Takes
- A few hours to a day
- Permit
- Sometimes
- Have ready
- Photos of the rooms
- A link to any fixture you’ve picked
05
Outlets and GFCI
More outlets where you need them, GFCI protection in kitchens, baths and outdoors, and USB outlets where the phones live. Tripping and dead outlets found and fixed.
- Takes
- An hour or two
- Permit
- Rarely
- Have ready
- Where you want them
- What’s tripping, and when
06
Ceiling fans
Fans hung on a proper fan-rated box, balanced so they don’t wobble, with a wall control. A new box and wiring where there was only a light.
- Takes
- About an hour each
- Permit
- No
- Have ready
- The fan, or a link to it
- Ceiling height, roughly
07
Generator and transfer switch
A standby generator, or a portable-ready inlet with a transfer switch, so the fridge, the lights and the AC stay on when the grid doesn’t.
- Takes
- 1 to 2 days
- Permit
- Yes, we pull it
- Have ready
- What you need to keep running
- Where a generator could sit
- Your gas supply, if any
08
Smoke and CO alarms
Hard-wired, interconnected alarms with battery backup in every bedroom and on every floor, as the code asks for. All of them sound when one does.
- Takes
- A couple of hours
- Permit
- No
- Have ready
- A rough count of bedrooms and floors
Times are typical, not promises. Every job gets a price in writing before it starts, and we tell you if your panel can’t take what you’re asking for.

Request service
Which one
first?
Send a few details and we call back within the hour during the day, with a window for a visit and a flat price for the call. Something urgent? Call now.
Request service
Smell burning, see sparks or have a hot panel? Leave the room and call 911, then us.